Com-Power PC-114 Precompliance Test System, with Rigol DSA815 Spectrum Analyzer

12.420,00 

•Manufacturer Specs:
•SPA-815TGE: Spectrum Analyzer 9 kHz to 1.5 GHz with tracking gen & EMI option
•AB-900: Biconical Antenna 25 MHz – 300 MHz
•AL-100: Log Periodic Antenna 300 MHz to 1 GHz
•PS-400: Near Field Probe Set 2 E-Field Probes and 1 H-Field Probe
•CGO-501 or CGO-505: Comb Generator for site verification
•PAM-103: Preamplifier 32 dB Gain 1 MHz to 1 GHz
•LIN-120A: Line Impedance Stabilization Network, 150 kHz to 30 MHz, 20 Amp.
•AT-812: Antenna Tripod 0.8 meter to 1.2 meter adjustable height

Artikelnummer: 0155 Kategorien: ,

Beschreibung

Perform Radiated & Conducted EMI pre-compliance testing at your facility up to 1GHz. The Com-Power PC-114 EMI Emissions Test System is a ideal solution performing pre-compliance EMC testing from 9kHz to 1GHz. It has essential equipment needed for radiated and conducted EMI emissions measurements. The system includes a spectrum analyzer, antennas, near field probes, a preamplifier, LISNs, and a non-conductive antenna tripod. Pre-compliance testing in EMC is a commonly used term not easy to define. In general, it implies testing done prior to formal testing for legal compliance. Formal legal compliance is performed at a faqcility designed and equipped with test instrumentation that is fully compliant with the applicable EMC standards. Such facility and instrumentation is capital intensive and can be expensive even to rent and not easily available. Compliance testing is performed per exacting requirements of the Standards and other reference documents adherering to the test methods and last detail. In addition, the test facility may require to be accredited by an accreditation body such as NVLAP, A2LA. Often it is desirable to know prior to compliance testing at such facility, whether a product is close to compliance and also how close. Precompliance testing is specially useful for specifications such as FCC, Part 15, EN 55022 or EN 55011 (CISPR 22 or CISPR11). Pre-compliance testing usually means using the full compliance methods but making a few educated compromises in use of site or equipment to reduce costs and testing time.

•Reference radiating source
•Radiated & Conducted
•Portable
•Battery Operated
•Three Year Warranty

 

 

Zusätzliche Informationen

Hersteller

Kategorien

Com-Power PC-114    Pre-Compliance Test System with Rigol DSA-815 Spectrum Analyzer

Com-Power PC-114 Produktdatenblatt

echo do_shortcode('[google-translator]');